...In Jehovah God we trust!

Technical Experience

 

OANDO/SEGENAL TCP SHOOT AND PULL JOB SUB CONTRACTED TO SPARKOIL BY ENVAL NIG. LTD

CLIENT NAME

JOB SCOPE

JOB DATE

WELL LOCATION/NO

RIG NAME

JOB REMARK

CLIENT REP

SEGENAL/OANDO

TCP SHOOT AND PULL

9th Oct-2009

AKEPO-01 STAGE-1

NOBLE/LLOYD NOBLE

COMPLETED

COLE WILLIAMSON

 

SEGENAL/OANDO

TCP SHOOT AND PULL

20th Oct-2009

AKEPO-01 STAGE-2

NOBLE/LLOYD NOBLE

COMPLETED

COLE WILLIAMSON

 

SEGENAL/OANDO

TCP SHOOT AND PULL

20th Nov-2009

AKEPO-01 STAGE-3

NOBLE/LLOYDE NOBLE

COMPLETED

COLE WILLIAMSON

 

SEGENAL/OANDO

TCP SHOOT AND PULL

15th Dec-2009

AKEPO-01 STAGE-4

NOBLE/LLOYDE NOBLE

COMPLETED

COLE WILLIAMSON

REFREE CONTACT:MD/CEO MR VALANTINE OBIDI,EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.,PHONE NO:+234-8033107514

CLIENT REP CONTACT:COLE WILLIAMSON,EMAIL,PHONE NO:

 

SPARKOIL DIRECT JOB EXPERIENCE

WALTERSMITH PETROMAN OIL LTD

TCP/DST

5th-April-2012

IBIGWE-7, F1.3 SAND

DEUTAG T-26

COMPLETED

BILL WATSON

 

WALTERSMITH PETROMAN OIL LTD

TCP/DST

21TH-April-2012

IBIGWE-7, F1.4 SAND

DEUTAG-26

COMPLETED

BILL WATSON

CLIENT REP CONTACT:GM WALTERSMITH PETROMAN OIL LTD-PETER EKHAESOMHI,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.,  PHONE NO:+234-8037028611

CLIENT REP CONTACT:TECH MANAGER-WALTERSMITH PETROMAN OIL LTD-BILL WATSON,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.,  PHONE NO:+234-8086616386/08075378386

 

NEWCROSS PETROLEUM

TCP/DST

06th-June-2013

EFE-1 STAGE 1

DRILLOG 101

COMPLETED

GLORY ODITA &

OLUGBENGA MAKU

NEWCROSS PETROLEUM

TCP/DST

11th-June-2013

EFE-1 STAGE 2

DRILLOG 101

COMPLETED

GLORY ODITA & OLUGBENGA MAKU

NEWCROSS PETROLEUM

TCP/DST

16th-June-2013

EFE-1 STAGE 3

DRILLOG 101

COMPLETED

GLORY ODITA & OLUGBENGA MAKU

NEWCROSS PETROLEUM

TCP/DST

20th-June-2013

EFE-1 STAGE 4

DRILLOG 101

COMPLETED

GLORY ODITA & OLUGBENGA MAKU

NEWCROSS PETROLEUM

BRIDGE PLUG INSTALLATION

05th-Nov-13

EFE-2

DRILLOG 101

COMPLETED

GLORY ODITA & OLUGBENGA MAKU

CLIENT REP CONTACT:OPERATIONS DRILLING ENGINEER-MIKE IKE, PHONE NO:+234 803157511

 

SPARKOIL/OILDATA PARTNERSHIP

SPDC

TCP SHOOT AND PULL

30th-March-2013

GBARAN-18

DEUTAG-209

COMPLETED

IRETI SANNI

CLIENT CONTACT REP:COMPLETION ENGINEER:SHINA,PHONE NO:+234 8070313598,07054058453

 

SPARKOIL/GEOPLEX PARTNERSHIP-SUBCONTRACTED TO SPARKOIL BY GEOPLEX

NPDC

BHP SURVEY

29th-Nov-2013-22th

Dec-2013

EGBEMA FIELD/8 WELLS

RIGLESS

COMPLETED

AKEEM RAJI

CLIENT CONTACT REP:AKEEM RAJI ,PHONE:+234 8060066225

SPARKOIL/GEOPLEX PARTNERSHIP-SUBCONTRACTED TO SPARKOIL BY GEOPLEX

NPDC

BHP SURVEY

5th-22nd-Mar-2014

EGBEMA FIELD/7 WELLS  IMO

STATE

RIGLESS

COMPLETED

AKEEM RAJI

 

 

 

 

 

 

 

NPDC

BHP SURVEY

8th-Aug-2014-17th- Oct 2014

UTOROGU FIELD/15 WELLS DELTA STATE

RIGLESS

COMPLETED

AKEEM RAJI

CLIENT CONTACT REP:AKEEM RAJI ,PHONE:+234 8060066225

 

SPARKOIL/GEOPLEX/EXPRO PARTNERSHIP-SUBCONTRACTED TO SPARKOIL ENERGY SERVICES NIG. LTD

SHEBAH EXPLORATION PETROLEUM

TCP/DST

22nd-Nov-2014-9th- Dec-2015

UKPOKITI-5

(Trident- 8)OFFSHORE

COMPLETED

JOHN ESENA

CLIENT CONTACT REP:COMPLETION ENGINEER-JOHN ESENA, PHONE NO:+234 9090408370

 

NIGERIA PETROLEUM DEVELOPMENT COMPANY

NPDC

BHP SURVEY

13th-Dec-2014-23rd Jan 2015

OLOMORO-OLEH FIELD   DELTA STATE

RIGLESS

COMPLETED

MR WISDOM

CLIENT CONTACT REP: ASSET SUPERVISOR-WISDOM, PHONE NO:+234 7062245293

 

NIGERIA PETROLEUM DEVELOPMENT COMPANY/NECONDE ENERGY JOINT VENTURE

NPDC/NECODE JV

SWABBING AND VALVE REPLACEMENT

10th-May 2015

ODIDI FIELD (SWAMP)

RIGLESS

COMPLETED

OLAYINKA AYENI

NPDC/ELCREST JV

WELLHEAD SERVICES, SWABBING, SLICKLINE OPERATIONS AND RMT with E-Line

29th-Jun-2015

OPUAMA FIELD

RIGLESS

COMPLETED

OLAYINKA AYENI

NPDC CONTACT REP: OLAYINKA AYENI, PHONE NO:+234 8030586192, EMAIL: This email address is being protected from spambots. You need JavaScript enabled to view it. | ELCREST CONTACT REP Hilary Azoba 07066784800

 

WALTERSMITH PETROMAN OIL LIMITED

WALTERSMITH PETROMAN OIL LIMITED

PROVISION OF 9 5/8" SQUEEZE PACKER

`28th June 2014

IBIGWE-9

HPEB 189

COMPLETED

ILESANMI SESAN

CLIENT REP CONTACT:GM WALTERSMITH PETROMAN OIL LTD-PETER EKHAESOMHI,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.,  PHONE NO:+234-8037028611

 

NIGERIA PETROLEUM DEVELOPMENT COMPANY/NECONDE

NPDC/NECONDE

WELL SECURING OPERATION

01 July- 22 July 2015

JONES CREEK

RIGLESS

COMPLETED

OLAYINKA AYENI

CLIENT CONTACT REP: OLAYINKA AYENI,PHONE NO:+234 8030586192, EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.

 

NIGERIA PETROLEUM DEVELOPMENT COMPANY/NECONDE

NPDC/NECONDE

WELLHEAD REVAMP, UNPLUGGING AND BHP SURVEY

13th Aug-6th Sept 2015

JONES CREEK

RIGLESS

COMPLETED

OLAYINKA AYENI

CLIENT CONTACT REP: OLAYINKA AYENI,PHONE NO:+234 8030586192, EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.

 

CHORUS ENERGY/EUNISELL

CHORUS ENERGY

BHP SURVEY

21st-Aug- 4th Sept- 2015

MATSOGO-1

RIGLESS

COMPLETED

 

CLIENT REP CONTACT: EUNISELL-PATRICK O. CALLAGHAN,  EMAIL: This email address is being protected from spambots. You need JavaScript enabled to view it.,  PHONE NO:+234-9038049909

 

CONOIL NIGERIA LIMITED

CONOIL NIGERIA LIMITED

TCP SHOOT AND PULL

1st Sept-6th Sept- 2015

ANGO-2ST-2

RIG-DEPTHWIZE

COMPLETED

 

CLIENT REP CONTACT: Idris Jimoh, E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., Phone No: 08159469080Agalabri Joel- Drilling Engineer  ,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it. ,  PHONE NO: 08155575563

 

WALTERSMITH PETROMAN OIL LIMITED

WALTERSMITH PETROMAN OIL LIMITED

NIPPLESS PLUG SERVICES

FUTURE COMITTMENT

IBIGWE-04

HPEB-187

COMPLETED

ILESANMI SESAN

CLIENT REP CONTACT:GM WALTERSMITH PETROMAN OIL LTD-PETER EKHAESOMHI,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it.,  PHONE NO:+234-8037028611

 

CONOIL NIGERIA LIMITED

CONOIL NIGERIA LIMITED

TCP/DST UNDERBALANCE

2nd Feb- 2nd Mar 2016

ANIM 2 (SAND 5)

RIG-DEPTHWIZE

COMPLETED

 

CLIENT REP CONTACT: Idris Jimoh, E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., Phone No: 08159469080Agalabri Joel- Drilling Engineer  ,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it. ,  PHONE NO: 08155575563

 

CONOIL NIGERIA LIMITED

CONOIL NIGERIA LIMITED

TCP/DST UNDERBALANCE

12th-29th Mar 2016

ANIM 2 (SAND 4 & 1)

RIG-DEPTHWIZE

COMPLETED

 

CLIENT REP CONTACT: Idris Jimoh, E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., Phone No: 08159469080Agalabri Joel- Drilling Engineer  ,  EMAIL:This email address is being protected from spambots. You need JavaScript enabled to view it. ,  PHONE NO: 08155575563

 

STERLING OIL EXPLORATION AND ENERGY PRODUCTION CO. LTD. (SEEPCO) SUB-CONTRACTED BY ENERGY QUEST

SEEPCO

FULL BHP SURVEY

6TH JUNE 2016 - 18th November

ANIEZE, OKWUIBOME

RIGLESS

ONGOING

NWOKE ATHANASIUS

CLIENT REP CONTACT: Nwoke Athanasius, E-mail:  Phone No: +2348066481945 Ojike Emmanuel: This email address is being protected from spambots. You need JavaScript enabled to view it., Phone No.: 09053898635

WALTERSMITH PETROMAN OIL LIMITED 

WALTERSMITH PETROMAN

FULL BHP SURVEY & WAX CUTTING

14TH JUNE 2017 - 14th July 2017

IBIGWE FIELD

RIGLESS

ONGOING

FUNSO OYENUGA

CLIENT REP CONTACT: Funso Oyenuga, email: This email address is being protected from spambots. You need JavaScript enabled to view it., phone: 08088039368

STERLING OIL EXPLORATION AND ENERGY PRODUCTION CO. LTD. (SEEPCO) IN PARTNERSHIP WITH ENERGY QUEST

SEEPCO/ENERGY QUEST

WIRELINE PERFORATING

30-JUN-17 TO 9 JUL 17

OKWUIBOME

RIG-

COMPLETED

OKEY ESOMEJU

CLIENT REP CONTACT: Okey Esomeju  | This email address is being protected from spambots. You need JavaScript enabled to view it.

PARTNERSHIP WITH HALLIBURTON

CHEVRON/HALLIBURTON

TCP/DST

3-SEP-17 TO 12 SEP 17

AGBAMI

RIG-ENSCO DS4

COMPLETED

KELECHI OFONAGORO

CLIENT REP CONTACT: Kelechi Ofonagoro | This email address is being protected from spambots. You need JavaScript enabled to view it. | +234-803-747-8414  & Wisdom Yorkor | This email address is being protected from spambots. You need JavaScript enabled to view it. |08055250208 & 08070366067

CONOIL NIGERIA LIMITED/HALLIBURTON

WIRELINE PERFORATING

4 SEP 17 TO 20 SEP 17

ANGO 6

RIG MAJESTIC

COMPLETED

KELECHI OFONAGORO

CLIENT REP CONTACT: Kelechi Ofonagoro | This email address is being protected from spambots. You need JavaScript enabled to view it. | +234-803-747-8414  & Wisdom Yorkor | This email address is being protected from spambots. You need JavaScript enabled to view it. |08055250208 & 08070366067

CHEVRON/HALLIBURTON

TCP/DST

7 DEC 17 TO 5 JAN 18

AGBAMI 39

RIG-ENSCO DS4

COMPLETED

KELECHI OFONAGORO

CLIENT REP CONTACT: Kelechi Ofonagoro | This email address is being protected from spambots. You need JavaScript enabled to view it. | +234-803-747-8414  & Wisdom Yorkor | This email address is being protected from spambots. You need JavaScript enabled to view it. |08055250208 & 08070366067

HERITAGE OIL LIMITED

HERITAGE OIL LIMITED/EUNISEL SOLUTIONS LTD

SLICKLINE AND GAUGES

26-SEP- 17 OCT 2018

ERIEMU 11T

RIGLESS

COMPLETED

PATRICK OCALLAGHAN

CLIENT REP CONTACT: Patrick Ocallaghan | This email address is being protected from spambots. You need JavaScript enabled to view it.

NEWCROSS E&P

NEWCROSS E&P

MULTIPLE ZONE PERFORATING THROUGH TCP

6-OCT-18 TO 12-OCT-18

AWOBA NW B

SHENGLI-4

COMPLETED

EJIMOFOR AGBO

CLIENT REP CONTACT: Ejimofor Agbo |This email address is being protected from spambots. You need JavaScript enabled to view it.

CURRENT COMMITMENTS

SPDC

TCP/DST

STANDBY

 

 

 

Oyeyemi Aboderin

NPDC

TCP/DST

STANDBY

 

 

 

 

NEWCROSS E&P

TCP/DST

STANDBY

 

 

 

 

CONTACT: This email address is being protected from spambots. You need JavaScript enabled to view it.

 

  

 

 

We are committed to living by the guiding principles of integrity, teamwork, dedication, HES and commitment to adding value to our clients.

 

 

Tubing Conveyed Perforation

  1. TCP shoot and pull (overbalance perforation)
  2. TCP DST
  3. Provision of squeeze guns for wireline perforating.
  4. TCP single trip Y-block dual completions using Y-block/gtm guide in the in the completion of oil and water injector wells. saves conventional 6- trip rig time in achieving these  completions.

  5. More

 

Downhole Memory Gauges

Our quartz gauge records elapsed time, pressure and temperature data in an internal memory. These gauges can be powered by lithium batteries below ground or from the surfaces using a wireline power supply.

  • * Quartz gauges can be programmed to sample at a user determined rate which can be fixed or variable.

  • More

Drill Stem Testing (DST)

Drill Stem Testing offers the fastest and safest method of evaluating the potential of a newly discovered hydrocarbon- bearing formation.

Our standard DST Stream includes

  • * Retrievable packer and safety joint - sizes from 4-Y,"  to 95/8"
  • * Tester joints - to shut in downhole to obtain formation pressure

  • More

Valve & Wellhead Testing

Wellheads, valves and their actuators are key assets in oil and gas industry. Ensuring they  work  properly is  key to hitch free  operation. Our expertise covers various  wellheads,  chokes  and  values  including  Cameron, Vetco Gray, FMC and Kraemer.

  • * First and second line maintenance.
  • * Repair,  refurbishment and installation of wellhead equipment & accessories.
  • More